HOME > TRAIL GUIDES > WASHINGTON > HIGH BRIDGE PARK

High Bridge Park

Location: Spokane, Washington
Ride Type: Many Trails To Choose
Trail Type: Single Track 90%
Dirt Road 10%
Distance: 4.00 miles (6.44 KM)
Duration: not specified.
Elevation Gain: 200 Feet (61 Meters)
Climbing: Rolling Terrain
Skill Level: Beginners
User Density: not specified.

Trail Description:
High Bridge Park is a pretty small park directly underneath the I-90 bridge on the West end of Spokane. There are a few trails here, across the river and across the road to the North of the park.

This is a good ride to take beginners or for weekend warriors to go out and do some laps.

The trails are fun, but this is definitely not a destination-type ride.

How to get there:
From I-90 Eastbound – Take Exit 280 (Maple St) and turn left onto Walnut

From I-90 Westbound – Take Exit 280 (Maple St) and turn right onto Walnut

Proceed north to 2nd Ave. Turn left onto 2nd, get in far right lane and stay in it to Oak. (2nd Ave. starts to veer left and turns into Sunset Blvd..don’t veer left, go straight thru neighborhood area) Take right on Oak to Riverside. Left on Riverside, down hill and after bridge, turn left on dirt road into Highbridge Park.

Additional Notes:
The enterance road can be VERY rough for most cars.