Trail Description:
A North Shore type trail, starts out with a ladder bridge over a stump, then bridge to 4 footer, log ride with drop, teeter totter, high bridge over ravine, log ride, etc. This trail is not done yet but is hoped to be done around March break.
How to get there:
Take the Lynn Valley trail over the first bridge, take the 4th trail on your left to the very top, and you will hopefully see it
Additional Notes:
This trail is not finished just yet. It will kick when it is done though!!!